part a

The following is a general summary of the tools required. Additional tools and equipment will be required for wall and or rack mounting and to fashion ground cable connections suitable to local requirements.

IP Office Parts

The minimum parts required are:

o IP500 V2 Control Unit

o Avaya SD Card

o Subscription Email

Tools Required

o 5mm Flat-blade screwdriver.

o Crosshead screwdriver.

o Anti-static wrist strap and ground point.

o RJ45-RJ45 Ethernet LAN Cable.

o M4 Cross-Head Screwdriver.

o Tools suitable for crimping a cable spade.

o If wall mounting, drills and tools for wall mounting fixtures.

System Administration

o Windows PC with:

o IP Office Admin suite installed.

o RJ45 Ethernet LAN port.

o SD Card reader.

Additional Parts Required

In addition to orderable IP Office equipment, the following items will be required.

o 14AWG Solid copper wire for ground connection of control units and expansion modules.

o Cable sleeve matching local regulator requirements for ground wires. Typically green for a functional ground and green/yellow for a protective ground.

o If wall mounting, additional fixtures and fittings suitable for the wall type and mounting kit being used.

o Cable ties and labels for tidying and identifying cables.